Sitemap

Amicuk Programming Answers

Vendor Evaluation in different date Range

-0001-11-30   Views:0

Advertisement

Hi Experts, Vendor Evaluation is configured in our client. Our requirement is like this. We want to get vendor evalulation month wise. like 01.04.2009 - 30.04.2009 01.05.2009 - 31.05.2009 01.06.2009 - 30.06.2009 01.07.2009 - 31.07.2009 How can I get

Hi Experts,
Vendor Evaluation is configured in our client. Our requirement is like this. We want to get vendor evalulation month wise.
like
01.04.2009 - 30.04.2009
01.05.2009 - 31.05.2009
01.06.2009 - 30.06.2009
01.07.2009 - 31.07.2009
How can I get vendor evaluation of a vendor for above period.
Please guide me, full points for helping answers.
Regards
GR

The replay answer
Advertisement
Hi,
Check Vendor Evaluation Report tr. ME6H(after selection drilldown on the basis of month), Hope this will work for you
thanks...

Go to See the other 2 answers

Vendor Evaluation in different date Range

Category:DefaultRelease time:-0001-11-30Views:130

Hi Experts, Vendor Evaluation is configured in our client. Our requirement is like this. We want to get vendor evalulation month wise. like 01.04.2009 - 30.04.2009 01.05.2009 - 31.05.2009 01.06.2009 - 30.06.2009 01.07.2009 - 31.07.2009 How can I get[More]

Vendor Evaluation - Statistical Delivery Date

Category:DefaultRelease time:-0001-11-30Views:130

Hi, The statistical delivery date is an important field during the calculation of the on-time delivery score. (see note 310666) After implementing a new support package this field wasn't filled up automatically anymore. Fortunately note 1039344 and 1[More]

Vendor Evaluation Standardizing Delivery Date Variance

Category:DefaultRelease time:-0001-11-30Views:130

Hi, We are determining what the settings should be for On-Time Delivery and Quantity Reliability under Vendor Evaluation.  I understand how the formual works when it determines the scores for these.  Can someone tell me from a business process perspe[More]

Number of Vendor in the given date range

Category:DefaultRelease time:2015-10-11Views:130

Hi All, I have a requirement like I need to calculate Total Number of Vendors in a given Date in Report Level. Could anyone please let me know how to do this? Thanks in advance. with Regards, Mahi.SHi Al, Thanks for the prompt answer. I tried creatin[More]

Delivary date parameter in vendor evaluation

Category:DefaultRelease time:-0001-11-30Views:130

hi where we maintain the delivary date parameter in vendor evaluation. nitinHi, Delivery date in vendor evaluation is a subcriteria for On time delivery and its automatic (3) Delivery date is calculated from GR from stastical delivery date in deliver[More]

Vendor evaluation - Confirmation Date

Category:DefaultRelease time:-0001-11-30Views:130

Dear all, am trying to run vendor evaluation for - confirmation date.. i have create a new confirmation  spro - MM -purchasing - confirmations - define external conf , setup conf  control i have included this confirmation in the PO ..delivery date in[More]

Vendor evaluation - downgrade analysis

Category:DefaultRelease time:-0001-11-30Views:130

Hi, I've a requiremnte in my project that the client wants to see why the grade for some criteria is below 100. So, I would like to know if I have any report showing de delays of the vendor and quantity difference in the goods receipt by Purchase Ord[More]

Vendor evaluation - Automatic new evaluation

Category:DefaultRelease time:-0001-11-30Views:130

Hi, Vendor evaluation is maintained. But it does not get updated automatically after GR. We have to update them one by one (ME61/ME63). Is there a way to automatically revaluate multiple vendors at the same time. Regards, PratapHello, If you want to[More]

Tables for vendor evaluation data

Category:DefaultRelease time:2015-10-11Views:130

Hai,     I want to know the tables in which vendor evaluation data is being stored, and I need to get vendor evaluation data through my RFC, can u suggest me the procedure how I need to do it.                              Thank you                   [More]

Confirmation date in vendor evaluation

Category:DefaultRelease time:2015-10-11Views:130

Hi Gurus,                Can you please let me know the settings to be maintained to get a score for the sub criteria Adherence to confirmation date during vendor evaluations. I've already maintained the purchasing org config settings like weighting[More]

Date range validity evaluation in BRM table

Category:DefaultRelease time:2015-10-11Views:130

Lectori salutem, Gurus salutem, I'm using 7.3 sp03. I would like to achieve the following with BRM (bit simplified): a parameter, ABC, is passed to a ruleSetService, and needs to be evaluated. The table is as follows: ABC startDate endDate Value 1 01[More]

Hot
Dear All, I have an error message with the Dunning Wizard, and cannot print any of the Dunning Letters. The error message is: 'Invalid variable number (RPT -6300) (Field F_136) Variable '452' I have already deleted this field from the layouts, but it [More]
Hi all, i'm new to macs so please forgive my lack of knowledge. Is it possible that if i create a website using iweb that one of my friend on another mac could edit the website on there own mac? Basicly so that we can both run the site together? Any [More]
Hello Gurus,       On basis we will determine the values  for the Model Parameter values (Alpha, Beta, Gamma, Sigma). Thanks, Siva.Dear Siva, the values are dependent from the forecast stratey and forecast model. The forecast strategy determines the [More]
Hello, I have problem with message mapping. I implemented SOAP-to-RFC scenario. The source message is of type http://sntcz.cz/xmlns/holidays:MT_Holiday, the target message of type urn:sap-com:document:sap:rfc:functions:Z_GET_SUPERIOR. But some error [More]
Hi to all, I'm not really that new to Java, in fact, I learnt Java in my Polytechnic last time. I learnt it for about 1 and a 1/2 years, and I did not use it for my final year project, not even work in related field for 3 years. Until currently, my d [More]
hello, I am working with dates. It looks like so: 1st I want to calculate a time span for example calculate cell A2 - cell A1. In cell A1 it is written 01.01.2010 (so first of January) and in cell A2 01.02.2010 (so first of February). I wrote the dat [More]
I have 2 questions: a.) how do you design the form to be able to save a copy of it completed for later use? b.) Is there a way to have something auto-populate when used in multiple locations? (i. e. a person's name) Thank you!So you can have a button [More]
Hello, How can I format a drive in Mac OSX Leopard? greetings, VincentGo up to the finder click GO then Utilities double click the program Disk Utility. Click on the drive you wish to format, you will see four boxes select the one called Erase and wi [More]
Could someone give an overview about the advantages, disadvantages and limitations when comparing OLAP Level to Value based hierarchies? Thanks, MarcioOLAP can handle both types of hierarchies. No performance advantage using one over the other (while [More]
Hello, I tried several times to install and update iphoto 9 to iphoto 11. I experienced the same problem as many people (corrupted library needing repairs, impossible to import pictures). Of course i had installed the update (9.1). I decided to insta [More]